Steel Procurement Control
Project readiness · steel need · vendor commitments · cost leveling
Source files and backups
Data is saved to the shared cloud workspace when connected. Upload refreshed schedules independently, or restore a JSON backup. Optional OFCI Project Master dates affect scheduling only; no changes to designs, quantities, approvals, or issued POs. Explicit Data (27) steel dates remain first priority.
Data is saved locally in this browser when supported. Existing imports reload automatically.
Project → skid type → procurement readiness Earliest steel need first
Data (27) steel dates take priority for projects and skid types with actual records. Missing dates fall back to Forecast AMER ROJ Need By minus the configurable lead. Source and estimates are labeled. Generic colo schedule rows are never treated as skid categories. Required skid counts and all gates are editable. A completed PO needs named vendor quantities covering the required skid count.
Monthly skid demand & issued PO coverage Compact view
Design quantities determine required units. Data (27) supplies scheduling dates (including generic colo-unit rows); forecast need-by minus lead supplies missing dates. PO quantities come from named vendors on project skid records only when PO issued is checked. PO quantities are allocated to the earliest unmet need month within that project/skid type, not by PO issue date. Click a skid category to expand its PO-covered and uncovered rows. The quantity shown is the total needed for that category in the month, across projects.
Design Library · Editable per-colo skid standards
Create or modify standard designs here, then assign a design to any project in Project Readiness. Projects without a matching standard can be assigned a new custom design. The selected design controls the skid categories and per-colo counts; Data (27) controls timing only. Per-project required quantities remain independently editable. Changes to a standard update default quantities only where no project-specific override exists.
Vendor Leveling · Quotes, landed costs & annual spend
Prices are maintained by skid category and vendor. Demand is taken from the monthly skid forecast; issued spend uses the named PO quantities from Project Readiness. Landed unit cost = unit price + shipping. Quotes are not purchase orders; unpriced issued quantities are flagged, not valued at zero.
Example UDS pricing is seeded from your provided leveling table as editable quotes. No quantities are pre-awarded.
Vendor Allocation Forecast Planning only · POs unchanged
Existing issued POs consume vendor capacity first. Forecast allocations use outstanding project/skid/month demand, preferring entire project-skid packages, then splitting when monthly capacity requires it. Every capacity is editable. Unconfigured capacity is zero, never assumed unlimited.
Monthly skid-type allocation shortfalls Vendor capacity / allocation gap
Demand not covered by issued POs or saved vendor forecast allocations. Independent of the vendor filter above; dates follow the forecast need months. Run Auto-allocate after changing vendor capacities to see the current capacity-constrained gaps. Click any red shortfall cell to view contributing projects and export detailed CSV.
Zero means all forecast demand is covered by issued POs and vendor allocation forecasts; it does not mean a PO has been placed. Undated demand is excluded.
Vendor capacity & ranking Configure before auto-allocation
Capacity is by vendor and skid type per calendar month. Monthly exceptions override the standard capacity. Rank 1 is preferred; landed cost breaks equal ranks. A disabled vendor receives no new forecast allocations, but existing POs remain.
Manual forecast allocations & locks
Use a lock for negotiated allocations. Locked forecast lines are preserved when auto-allocation runs. They are not purchase orders. Any excess demand or capacity conflict remains flagged.
Annual projected spend and savings
Vendor revenue is supplier spend from quoted landed costs. Savings compare each priced quantity against its skid-type budget. Unpriced assignments are reported separately rather than valued at zero.
Vendor Delivery Schedule · Monthly quantities
Every vendor with an issued PO is listed by skid type. Enter an optional delivery month on each project/vendor PO to override the default need-by allocation. Otherwise the schedule is an estimated delivery requirement, not a supplier-confirmed shipping commitment.